Renovation Budget Planner
Plan your home renovation budget with cost estimates for materials, labor, and contingency.
Track your total project cost and per-square-foot price.
Home renovation budget estimation combines material costs, labor costs, permit fees, and a contingency allowance to project the total cost of a remodel before breaking ground. Professional contractors use square footage and room-type benchmarks as a starting point.
Total renovation cost formula: Total Cost = Material Cost + Labor Cost + Permit Fees + Contingency
Contingency rule: Contingency = 10–20% of (Material + Labor) Use 10% for new construction or simple cosmetic updates. Use 20% for older homes where hidden problems (rot, outdated wiring, plumbing surprises) are common.
Labor-to-material ratio: Most renovations run 40–50% materials and 50–60% labor. High-labor projects (tile, framing, electrical) skew toward 60–70% labor.
Cost per square foot benchmarks (US, 2024):
- Kitchen remodel (full): $100–$300/sq ft ($25,000–$75,000 typical)
- Bathroom remodel (full): $150–$400/sq ft ($10,000–$25,000 typical)
- Basement finishing: $25–$65/sq ft
- Room addition: $100–$200/sq ft
- Roof replacement: $4–$10/sq ft (by roof area)
- Flooring replacement: $5–$25/sq ft installed
- Interior painting (full house): $2–$6/sq ft of floor area
What each variable means:
- Material cost - purchased directly or through the contractor; generally 40–50% of the total
- Labor cost - varies by trade and region; electricians and plumbers typically $75–$150/hr, general carpenters $50–$100/hr
- Permit fees - required for structural, electrical, plumbing and HVAC (Heating, Ventilation and Air Conditioning) work; typically $500–$3,000 depending on scope and municipality
- Return on investment (ROI) - not all renovations add proportional value. Kitchen and bathroom remodels recover 60–80% of cost at resale. Pools and sunrooms often recover less than half.
Worked example: Bathroom refresh: 60 sq ft. Mid-range finishes, fixtures staying where they are.
Materials: vanity ($800) + toilet ($350) + tile ($600) + fixtures ($400) + misc ($250) = $2,400 Labor: plumber 8 hrs × $100 = $800; tile setter 12 hrs × $85 = $1,020; carpenter 6 hrs × $75 = $450 = $2,270 Work subtotal (materials + labor): $4,670 Permits: $600 Contingency, 15% of the work subtotal: $4,670 × 0.15 = $700.50 Total Renovation Budget: $5,970.50 Cost per sq ft: $5,970.50 ÷ 60 = $99.51/sq ft
Note that the contingency is calculated on materials and labor only, not on the permit fees. Permit costs are quoted by the municipality and published in advance, so there is nothing to be surprised by. A contingency exists to cover the things nobody can quote.
That $99.51/sq ft sits well below the $150-$400 range in the table above, and that is not a mistake. The table is for a full gut: moving the toilet, opening walls, replacing the tub. This example keeps every fixture in its existing location, which is the single biggest cost lever in a bathroom. Move the plumbing and the same 60 sq ft easily doubles.
How we build and check this calculator
This calculator runs entirely in your browser, so the numbers you enter stay on your device. The math behind it is written by hand and tested against worked examples and standard references before the page goes live.
SuperGlobalCalculator is independently built and maintained. See how we build and verify our calculators.
More Real Estate Calculators
- Title Insurance Cost Estimator
- DSCR Calculator
- Home Appreciation Calculator
- Land Development Cost Calculator
- Rent Roll Analysis Calculator
- Cap Rate Calculator
- Cash-on-Cash Return Calculator
- Gross Rent Multiplier (GRM) Calculator
- Home Sale Net Proceeds Calculator
- Land Area Converter
- Mortgage Refinance Calculator